Calendar

Jun-2013
M T W T F S S
17 18 19 20 21 22 23
Economic Events
list ANZ Job Advertisements (MoM)
list EIA Natural Gas Storage Change
Results
list Havells India | Union Bank (I) | Dena Bank | Central Bank
IPO
listNo IPO today
 

Cabinet approves sub-project for 6-laning of Vadodara-Surat highway

India Infoline News Service/ 10:59 , Apr 27, 2012

The total cost of the project including land acquisition, rehabilitation and pre-construction activities will be Rs 5.09bn.

The Cabinet Committee on Infrastructure has approved the development of six laning of Vadodara-Surat section on National Highway-8 in Gujarat under NHDP Phase V on Design, Build, Finance, Operate and Transfer (DBFOT/BOT) basis. The total length of the road will be 6.745 kms.

The total cost of the project including land acquisition, rehabilitation and pre-construction activities will be Rs 5.09bn. The concession period will be 12 years, including construction period of 30 months.

The main object of the project is to expedite the improvement of infrastructure in Gujarat and also in reducing the time and cost of travel for traffic, particularly heavy traffic, plying between ‘Vadodara-Surat’.

The stretch of Vadodara-Surat is an important corridor of Golden Quadrilateral, which links two major cities of Gujarat, leading to Mumbai and other parts of the country. It will also increase the employment potential for the local labourers for the project activities.

The project is covered in the District of Bharuch in Gujarat.

 



Rate This Article Rate 1 Rate 2 Rate 3 Rate 4 Rate 5

Recent News Videos