13 May 2022 , 03:45 PM
The Kwar HE Project is being executed by Chenab Valley Power Projects Limited, a Joint Venture of NHPC Limited (a Govt of India Enterprise) & JKSPDC (a Govt of J & K Enterprise) (the Authority) to harness the vast hydro potential of river Chenab. Hon’ble Prime Minister laid the foundation stone of Kwar HE Project.
Kwar HE Project is a run-of-river scheme with a Concrete Gravity Dam located at District Kishtwar of J & K. The Project envisages construction of 109m high concrete gravity dam above deepest foundation across river Chenab of length 195m at top. Kwar HEP is a 540MW (4x 135 MW) project with estimate generation of 1975.54 MU (in a 90% dependable year).
The Letter of Acceptance for the Contract is issued by the Authority and the works are scheduled to be completed in a period of 48 months as per the Contract terms. The Company already has three ongoing projects in the nearby Vicinity in the J&K State with similar geological terrains which is an added advantage for execution of this new Project.
Patel Engineering ended at Rs22.05 apiece up by Rs1.05 or 5% from its previous closing of Rs21 apiece on the BSE.
Related Tags
IIFL Customer Care Number
(Gold/NCD/NBFC/Insurance/NPS)
1860-267-3000 / 7039-050-000
IIFL Capital Services Support WhatsApp Number
+91 9892691696
IIFL Capital Services Limited - Stock Broker SEBI Regn. No: INZ000164132, PMS SEBI Regn. No: INP000002213,IA SEBI Regn. No: INA000000623, SEBI RA Regn. No: INH000000248
ARN NO : 47791 (AMFI Registered Mutual Fund Distributor)
This Certificate Demonstrates That IIFL As An Organization Has Defined And Put In Place Best-Practice Information Security Processes.