arrow-left

KP Energy bags 'Erection and Installation' order from ABREL Century

  • India Infoline News Service |
  • 19 Oct, 2022 |
  • 1:04 PM
KP Energy Limited informed that ABREL Century Energy Limited awarded an order to provide Erection and Installation services for 5 Suzlon make wind operated electricity generators (also known as windmills or WTGs) of model 5120 with a rated capacity of 2100 kW (two-thousand-one-hundred-kilo-Watt) (with a hub height of 140 metres) at the Vinjalpar site in Gujarat.

AB REL Century Energy Limited is developing the facility, while KP Energy will offer services such as loading and unloading of WTG materials on site, inter-handling of WTG, and erection and installation of the WTGs.

KP Energy has begun its scope of work, and the project is expected to be finished in Q3FY23.

At around 1.03 PM, KP Energy was trading at Rs414.80 down by 0.32% from its previous closing of Rs416.15 on the BSE. The scrip touched intraday high and low of Rs416.85 and Rs407 respectively.

For feedback and suggestions, write to us at editorial@iifl.com

Invest wise with Expert advice

ad IconAd Image

Most Read News

Article Image
  • 14 March, 2022 |
  • 7:03 AM

The US Federal committee's meeting will conclude on March 16, 2022.

Most Shared News

No Record Found