iifl-logo

Invest wise with Expert advice

By continuing, I accept the T&C and agree to receive communication on Whatsapp

sidebar image

L-;T constructs 7-storey facility for DRDO in record 45 days; stock slips ~1%

28 Mar 2022 , 11:03 AM

The buildings arm of Larsen & Toubro has set a record by constructing the 7-storey, state-of-the-art Flight Control System (FCS) Integration Facility for the Defence Research and Development Organization (DRDO) in just 45 days using Integrated Hybrid Modular Construction Technology (IHMCT).

The facility was inaugurated on March 17, 2022, by the Hon’ble Minister of Defence, Government of India, Shri Rajnath Singh in the august presence of Shri Basavaraj Bommai, Hon’ble Chief Minister of Karnataka, Dr. G. Satheesh Reddy, Secretary Department of Defence R&D & Chairman, DRDO and other dignitaries.

“This facility shows that India can build anything in a short time,” praised DRDO Chairman, Dr. G Satheesh Reddy, adding that while the concept & technical design was developed by DDRO and detailed engineering & execution by L&T, teams from liT-Madras & IIT-Roorkee conducted design checks and provided technical support.

Significant development to modernize and enhance the strategic capabilities of the Indian Defence, the facility is the result of L& T’s unique integrated off-site and on-site construction approach.

“We adopted IHMCT, used for the first time in the Indian construction industry, to substantially reduce the cycle time with a dedicated team of engineers, architects and structural designers who have worked on it to make it a success,” remarked Whole Time Director & Senior Executive Vice President (Buildings), L&T, Mr. M V Satish.

Constructed on a total built-up area of 130,000 sq. feet, the site team had to coordinate with 21 off-site locations to integrate design, structure, architecture, and MEP services. Going forward, this hybrid construction system developed by L& T will help increase productivity, optimize resource utilization, reduce losses due to wastage, and speed up the pace of construction.

Larsen & Toubro is currently trading at Rs1,735.90 down by Rs15 or 0.86% from its previous closing of Rs1,750.90 on the BSE. The scrip opened at Rs1,752 and has touched a high and low of Rs1,761 and Rs1,733.70 respectively.

Related Tags

  • L&T new contracts
  • L&T Stocks
  • L&T7-StoreyBuilding
  • L&TBuilding
  • L&Tconstructions
  • L&TNews
sidebar mobile

BLOGS AND PERSONAL FINANCE

Read More
Knowledge Center
Logo

Logo IIFL Customer Care Number
(Gold/NCD/NBFC/Insurance/NPS)
1860-267-3000 / 7039-050-000

Logo IIFL Capital Services Support WhatsApp Number
+91 9892691696

Download The App Now

appapp
Loading...

Follow us on

facebooktwitterrssyoutubeinstagramlinkedintelegram

2025, IIFL Capital Services Ltd. All Rights Reserved

ATTENTION INVESTORS

RISK DISCLOSURE ON DERIVATIVES

Copyright © IIFL Capital Services Limited (Formerly known as IIFL Securities Ltd). All rights Reserved.

IIFL Capital Services Limited - Stock Broker SEBI Regn. No: INZ000164132, PMS SEBI Regn. No: INP000002213,IA SEBI Regn. No: INA000000623, SEBI RA Regn. No: INH000000248
ARN NO : 47791 (AMFI Registered Mutual Fund Distributor)

ISO certification icon
We are ISO 27001:2013 Certified.

This Certificate Demonstrates That IIFL As An Organization Has Defined And Put In Place Best-Practice Information Security Processes.